Ship Breaking
Withdrawal from service, sale, the final voyage to the breaking yard and the dismantling that followed.
-

MSC Baltic III Wreck Removal Reaches 63 Percent
With 63% of vessel tonnage removed, MSC Baltic III’s dismantling still involves shoreward pulls, residual fuel and shoreline work.
-

From SS France to SS Norway and the Beach at Alang
The French Line’s France became the cruise ship Norway, was withdrawn after a fatal boiler explosion in 2003, and was broken up at Alang.
-

Clemenceau’s Long Road From Toulon to the Hartlepool Breakers
How the retired French carrier Clemenceau went from Toulon towards India and back before being dismantled at Hartlepool in 2009 and 2010.
-

Normandie, the French Line’s Record Liner Lost at Pier 88
How the French Line’s Normandie was designed, why she stayed in New York in 1939, and how a conversion fire at Pier 88 ended…
-

Seawise Giant, the Longest Ship Ever Built
The tanker built as Oppama and known as Seawise Giant, Happy Giant, Jahre Viking, Knock Nevis and Mont, and what each name marked.
-

The Last Voyage and Scrapping of RMS Mauretania
How Cunard’s Mauretania was laid up, her fittings auctioned and her hull broken up at Rosyth from 1935, and which parts of the ship…
-

Exxon Valdez Before and After Bligh Reef
The Exxon Valdez from her 1986 delivery to the Bligh Reef grounding, the repairs, five later names and her final beaching at Alang in…
-

RMS Olympic’s Final Voyage to Jarrow in 1935
How RMS Olympic was sold, sailed to Jarrow in 1935, was auctioned over ten days and finished at Inverkeithing, and which of her fittings…
-

Batillus, Shell’s 550,000 Tonne Supertanker
Batillus, the first of four 550,000 tonne tankers built at Saint-Nazaire: her design, twin steam plant, the port of Antifer and a career of…
-

Costa Concordia From Giglio to the Genoa Scrapyard
The Costa Concordia casualty of 2012 and the salvage that followed: fuel removal, parbuckling, sponsons, the tow to Genoa and three years of dismantling.

